Shpime eksploruese ne Gjazuj Mirdite (Mineralizime kuarc sulfure ne vullkanitet bazaltike,Au,Ag)
| Investitor | “Jab Resources”(Canada) |
|---|---|
| Axesi rrugore : | Tereni malore afro 25km nga kampingu |
| Volumi total : | 3500 m |
| Thellesia max : | 250 m |
| Numri I turneve : | Dy (12 ore/turn) |
| Volumi I realizuar ne 24/h : | 50m |
| Kendet e shpimeve : | -45ᵒ +90ᵒ |
| Metoda e shpimit | Shpime me diamond (Wireline Double Tube Core Barrel System) |
| Diametri I shpimit | NQ(75.7mm) |
| Diametri I Kampionit : | NQ(47.6mm) |
| Norma e kampionit : | 92% |
| Tipi formacional : | Vullkanite bazaltike me system damarore kuarcore |
